MSD Logo

orangedrip.gif (1036 bytes) ANNUAL REPORT
AWARDS
BOARD MEETING
AGENDA
BOARD MEETING SUMMARY
purpledrip.gif (1037 bytes) CALENDAR OF EVENTS
ltbluedrip.gif (1036 bytes) GUIDE TO MSD
orangedrip.gif (1036 bytes) MSD BOARD
MSD HISTORY
ltbluedrip.gif (1036 bytes) NEWS RELEASES
purpledrip.gif (1037 bytes) PRINCIPLES FOR RESULTS BASED MANAGEMENT

QUARTERLY BILL INSERTS

RELATED LINKS
ltbluedrip.gif (1036 bytes) STRATEGIC BUSINESS PLAN
UPDATE NEWSLETTER

 

The 1964 flood

The Ohio River floodwall had been completed just over eight years when it faced its first test. In March, 1964, the river rose to its highest level since 1945, and its fourth-highest level in history.

The test was not a success. The City of Louisville’s Public Works department, charged with maintaining and operating the floodwall system, failed to install several downtown street closures in time. After two days of rising waters, the U.S. Army Corps of Engineers took control from the city. National Guard troops and city firemen helped with the work. Truckloads of fill material were dumped into the 10th Street opening to stop the river’s invasion; thousands of sandbags helped at several other closures.

MSD executive John L. Person, who had overseen part of the floodwall’s construction, called the affair "a fiasco," an assessment that did not endear him to the city administration.

Later, in its review of the problems, the Corps of Engineers cited the need for better training, better organization, and quicker response when a flood threatened. It also cited the need for regulations to prevent buildings from being constructed in flood-prone areas.

 

 

On March 13, 1964, a truck dumps fill material to be bulldozed into the opening for the 11th Street floodwall closure, which hadn't been installed in time to beat the rising waters.  The water behind the floodwall is being returned to the river by pumps at the 11th Street closure and at the 10th Street closure in the background.

Courier-Journal and Louisville Times
Photo by Robert Steinau

MSD History continued 

Last Updated: January 05, 2004

| Home | Environmental Commitment | Your Home | Education | Business | Watersheds |
| About MSD | Inside MSD | Programs & Projects |
Related Links | Search | Contact Us |
| Privacy Notice |

Copyright © 2008 by the Louisville/Jefferson County
Metropolitan Sewer District (MSD) Louisville, Kentucky
This site developed by Net Tango.