Rural/Red Oak Rear Yard Drainage
| |||
| |||
Project Description
Project involves the installation of a paved rear yard drainage system from Robinwood Drive to Rustic Way between Road Oak and Rural Way. | |||
Need
To eliminate/alleviate standing water and rear yard flooding issues | |||
Other Information To construct this project MSD will need to acquire easements. This project can only be constructed if the easements are acquired. |