Apache Road Drainage Improvement Project
| |||
| |||
Project Description
This project will include the installation of 330 linear feet of 3' flat bottom paved ditch, 70 linear feet of 15 pipe and 1 catch basin. Approximately 10 trees need to be removed. | |||
Need
This project will help improve an undersized drainage system in the rear yards of Apache Road from 5805 to 5809. | |||
Other Information |