Cadence Court Drainage Improvement Project
| |||
| |||
Project Description
This construction involves the installation of 200 linear feet of paved ditch at the side of 1406 Cadence Court to connect with the existing 7' flat bottom paved swale. | |||
Need
Construction of this project will help alleviate erosion and maintenance problems along the existing steep ditch at the side of 1406 Cadence Court. | |||
Other Information Project scope was planned, but not budgeted before the DRI-1 Program. Work planned beyond the DRI-3 Program. |