River's Edge Pump Station Elimination
| |||
| |||
Project Description
This project eliminates the existing River's Edge Pump Station and 3-inch diameter force main. Construction of approximately 2,400 LF of 8-inch diameter gravity sewer from the River's Edge Pump Station to a proposed sewer in Riviera Subdivision is required. | |||
Need
This project combines with the Riviera area sanitary sewer project to eliminate an existing pump station and force main now serving the River's Edge Subdivision. | |||
Other Information The proposed Riviera Area Assessment Project will discharge to the Louisville Boat Club pump station, which is tributary to the Ohio River force main via the Muddy Fork Pump Station. Treatment is provided at the MFWTP. |