12008 Hudson View Court Drainage
| |||
| |||
Project Description
Install boulder toe and erosion prevention along side discharge pipe from road to wooded common area. | |||
Need
An existing natural drainage channel is steep and eroding. Pretection is needed to prevent property loss to 12008 Hudson View Court. Also a public safety concern. | |||
Other Information |