203 Marengo Drive Drainage Improvement
| |||
| |||
Project Description
Install 300 LF of 15-inch diameter pipe, install 2 catch basins, 10 LF of sidewalk modify one catch basin, seed mulch and net 400 SY | |||
Need
Drainage from Old Shelbyville Road flow through 203 Marango and stand for several days. There is not a defined out let and property is flat. | |||
Other Information |