16625 Ledges Drive Drainage Improvement
| |||
| |||
Project Description
Install 120' of 18" Pipe to extend drainage pipe from Eastern High to dierct toward creek, away from home -- Regrade and Build Berm to direct flows away from upstream rear yard from 16625. Scope of project is to direct flows from Eastern HS away from 12625 Ledges. Also will look at upstream properties and how flow form them is dirested on to 12625. | |||
Need
Water from upstream properties and the school are flooding 12625. | |||
Other Information |