MFWTP Blend/Decant Tank/MEB
| |||
| |||
Project Description
Repair cracks in the 5th floor of the MEB building. Repair damaged concrete in the ceilings of the blend well and decant tanks at the MFWTP. | |||
Need
The floor cracks and ceiling damage can cause failures in the future if not addressed soon. | |||
Other Information |