6th Street PS Closure Modification
| |||
| |||
Project Description
Modify all existing street closure panels and trusses for installation with Telehandler type equipment due to proposed installation of walkway over the top of the 6th St. floodwall street closure. | |||
Need
When walkway is installed the street closure can not be installed with crane as in the past. Modifications will be necessary for installation of closure. | |||
Other Information |