Elimination of CSO #106 Project
| |||
| |||
Project Description
This CSO will be eliminated as part of the overall CSO control strategy for the Beargrass Creek Watershed. This overflow point will be blocked off following a separation of stormwater from sanitary flow and treated as a sewer separation project | |||
Need
As part of the long-term control plan, CSOs of this size and type are to be eliminated when practical and cost effective. | |||
Other Information None |